The attic has been missing from the last couple of episodes. Work up there never stopped. I couldn’t find a good way to blend it in with the range hood and the pantry drawings, so we saved it up to show you in one go. This is that episode, and it is mostly plasterboard: around beams, over a staircase, and on top of a mistake I made with the insulation.
First, A Thank You
Before we go upstairs, a quick word on last time. I told you I’m starting my own cabinetry business in France, and the comments that came back were lovely. So many of you said you wanted to see it on the channel and wanted to cheer it on. That means a lot to me, and to Romy especially.
It also went a bit nuts afterwards. I’ve been talking to a number of people about their kitchens and the cabinetry they need, and I’ll share updates over the next few episodes. That includes some of the design process, which I know you enjoy and which I’d like to get you involved in. It’s exciting and a little tiring, because it’s all new to me and I’m learning as I go.
The range hood, meanwhile, is still making us happy. The longer it’s up, the more glad we are that we built it. And thank you again for all the help with the pantry designs, which are now final.
Back Up In The Attic
We’ve made a decent bit of progress up here over the last few days. The plumber has been in to fit the pipework and the last of the bathroom waste, which was the thing holding up the insulation and the plasterboard.

With that done I got the insulation into the last wall of the main bedroom and into the bathroom wall on the corridor side. The next job was boarding the internal walls. Not all of them can be closed yet. The aircon installers and the electrician both need to get above the ceiling, so in places I’ve left the boards off above beam height.


Templates For The Bathroom
The bathroom was slower. There are beams everywhere, and measuring a shape, cutting it and offering it up doesn’t work in a room where nothing is straight. Even when every measurement is right, the cuts drift off in one direction and the piece won’t go in.
So I went back to the template method I used on the outer walls, before the internal walls went up. You glue strips of cardboard together in place around the beam, lift the template off, trace round it onto the board and cut it out. It takes longer, and it wastes a lot less plasterboard.


The Insulation Mistake
I made an error with the internal walls, and it wasn’t a small one.
The metal rails in these walls leave a gap of 7cm. I ordered 8cm insulation, because we had 8cm left over from the roof and I’d been told it would compress a bit. A tighter fit and better soundproofing, I thought.
On the outer walls that works. There’s only one layer of plasterboard in front, so the insulation can bulge backwards. An internal wall has a board on both sides. With the first side on, the insulation has nowhere to go but forwards, and when the second board goes over it, the board bends. You end up with a wall that goes in and out like a small wave.

I’m not ripping the insulation out and putting it back in. That would cost too much money, too much time and what’s left of my mental health. The way round it is a shim, or a cale as they’re called in French. I’m running strips of leftover plasterboard down every rail, then fixing the full boards on top of those. That gives an extra centimetre between the rail and the board, which is enough room for the insulation.

It’s frustrating and it adds time. I have done pretty much everything wrong that you could do wrong with this attic, so if you’re planning internal walls of your own, check your insulation against your rails before you order. I should have.
Plasterboarding Over A Staircase
The walls over the stairs were the next problem. Taking the old plasterboard off them was easy, because we could knock it down. Putting new boards up means getting to the top of a wall with a stairwell underneath it. From the steps I can’t reach, and a ladder on the stairs is far too dangerous. I don’t own one made for stairs anyway.

So I built a wooden platform across the stairwell, something we can lift out and put back as we need it. I had no real plan and made it up as I went, which is exactly how you want to approach working above a drop you could break your neck in.



A Saturday In The Hallway
Then the aircon installers came and fitted the system, which cleared the way for the rest of the plasterboard.

Romy joined me for a Saturday of it. Finishing the whole attic in a day was never going to happen, so the aim was the hallway, working off the platform so that we could stop banging our heads on the woodwork. There was some doubt about whether even that was possible, given that one section had already taken a whole day on its own. I was more hopeful, since I’ve had a bit of practice now.


Then came the tidy up, which with plasterboard is a job in itself.


There’s a small bit left to board once the aircon is all connected, but otherwise the plasterboarding is done and the rooms up here have walls. You can watch it all go up in the video at the top of the page. If you’ve ever plasterboarded over a staircase without building something questionable to stand on, tell me how in the comments.